Rock Creek Culvert Removal Restoration Project

With assistance from the California Conservation Corps, WSRCD recently completed winterization of Phase 2 of the Rock Creek Culvert Removal Restoration Project. The US Bureau of Reclamation Construction crew from Provo, Utah worked from August to November to remove the upstream 100-feet of the large crushed culverts that were severely damaged after the 2018 Carr Fire. Rock Creek is now able to flow freely through the large pipes for the upcoming winter season. The final phase of work to remove the remaining 200 linear feet of metal pipes and fully restore the natural stream channel will be completed in summer 2026. Upon completion, the project will have removed both of the 12-foot diameter, 300-foot long pipes and over 80,000 cubic yards of fill material that encompassed the massive abandoned railroad crossing.

This work is funded through the US Bureaus of Reclamation and Land Management and a WSRCD-received grant from the California Department of Fish and Wildlife Cannabis Restoration Grant Program.

A landscape showing an eroded hillside with vegetation, debris, and a damaged metal structure near a flowing creek under a stormy sky.
Pre-Project Conditions - Severe post-fire runoff caused severe damage to the pipes, completely closing them off
The image shows construction equipment, including excavators and a drainage pipe, working on a dirt excavation site.
Bureau of Reclamation Provo, Utah construction staff working on removing sections of the culvert 

 